Scheduled Power Maintenance Complete For Cabinets 710A13, 710A14, 710A15

  • Wednesday, 19th August, 2015
  • 12:28pm

NeedaServer technicians conducted scheduled Maintenance today, Wednesday August 19th at 1300 hours PST. Maintenace went according to plan and PDUs were transfered over to newly installed upgraded circuits and all servers have been powered up. Please notify us at support@needaserver.net or create a ticket if there are any questions, concerns or issues with your servers. 

Maintenance Ticket : https://www.needaserver.net/billing/admin/supporttickets.php?action=view&id=8351

Scope of Work:

As a preventative measure we will be replacing the power circuits above your cabinets. To do so, we do a soft shutdown of your server and plug it into the new PDU.  The move will be swift.

Anticipated Downtime: 5 mins

Window: 1 Hour (1300-1400 Hrs PST)

We will gracefully shut down servers.

Time: The Maintenance window is 1 hour. This is rather routine and do not expect more than 5 minutes of downtime per client.

Cabinets Affected:

710A13

710A14

710A15 

Warmest Regards,

« Back